Equipment catalogue
Chemical Systems

Chemical Dosing Systems

Integrated dosing skids for polymer, coagulant, pH correction and biocide — accurate metering, automatic control and hazardous-area options.

Chemical Dosing Systems

Reliable chemical dosing is the difference between a wastewater plant that hits its permit and one that spends its life reacting to failures. Paragon builds and supplies dosing skids for polymer, coagulant (PAC, alum, ferric), pH correction (caustic, acid) and biocide dosing across drilling, wastewater and industrial process duties.

Each skid is configured around the actual chemical, dose rate, control philosophy and area classification — not an off-the-shelf catalogue package.

How it works

  1. 1Chemical is drawn from an IBC, day tank or bulk storage into a suction manifold with strainer and calibration column.
  2. 2A dosing pump (solenoid diaphragm, motor diaphragm or progressive-cavity) meters flow accurately against a 4–20 mA signal or manual setpoint.
  3. 3Discharge injects into the process line via an injection quill, with backpressure, pressure-relief and isolation valves as required.
  4. 4A PLC or dedicated controller closes the loop against a process signal — pH, ORP, turbidity, flow — and alarms on out-of-range conditions.

Typical specifications

Dosing pumpsSolenoid, motor-diaphragm, PC (0.1 – 2,000 L/hr)
TurndownUp to 1000:1 with variable-speed drives
Tank sizesIBC, 200 – 20,000 L bunded polyethylene or 316L
MaterialsPVC, PP, PVDF, 316L wetted parts
ControlLocal HMI, PLC or SCADA integration
CertificationATEX / IECEx options

Specifications indicative — actual configuration sized against your specific process.

Typical applications

  • Polymer dosing to centrifuges, filter presses and DAF units
  • Coagulant dosing on primary and tertiary treatment
  • pH correction on effluent discharge
  • Biocide and scale inhibitor dosing on cooling and produced water
  • Emulsion breaker dosing on oil-water separation

Selection factors

Pump technology follows the chemical

Solenoid pumps suit low-dose, low-viscosity duties. PC pumps handle polymers, high-viscosity or high-solids chemicals. Match technology to the fluid, or pay in downtime.

Bunding and material compatibility

Every dosing skid should be bunded to full tank volume and built from materials rated for the specific chemical. Ferric on 304 stainless, sodium hypochlorite on PVC — get this wrong and you rebuild the skid in six months.

Instrumentation earns its keep

Flow meters, calibration columns and low-level switches turn a dosing skid from a black box into a controllable process. Skimp on instruments and every operator problem becomes a shutdown.

FIELD TIP

The two most common dosing skid problems are wrong pump for the chemical and no calibration column on the suction. Both are ten-minute fixes at design, weeks of pain in service.

WEAR PARTS & CONSUMABLES

Spares we supply

Diaphragm heads and cartridges
Injection quills and check valves
Calibration columns and flow meters
Pulsation dampers and PRV assemblies
PLC / controller spares

Why Choose Paragon

30+ years of field experience

Our engineers have specified, commissioned and troubleshot equipment on projects across Europe, Africa, the Middle East and the Americas.

Independent technical advice

We are not tied to a single manufacturer — recommendations are driven by fit for your process, not by margin.

Global sourcing network

Trusted OEM and specialist aftermarket suppliers, with dual-sourced wear parts to protect you from lead-time risk.

Delivered ready to work

Inspection, testing, commissioning and technical support included — not left as an afterthought.

Responsive engineering support

One working-day response on technical enquiries, and hands-on troubleshooting when you need it.

Long-term client relationships

Most of our work comes from clients we've supported through multiple projects and equipment life cycles.

Need help specifying a chemical dosing systems?

Share your flow rate, feed characteristics and site constraints — our engineers will come back with a concrete configuration and budget within one working day.