Client: Civil engineering contractor (named on request under NDA)
A civil contractor required a modular slurry treatment plant to support a bored tunnel section driven by a slurry TBM. Available surface pad space was tight, and the programme required the plant on line and stable within a short mobilisation window.
Sizing of shaker, cyclone and centrifuge train against the design TBM slurry rate and expected geology.
Modular skid layout to fit the available footprint, with equipment craneable in and out for site access windows.
Rental supply of the treatment plant plus back-up wear parts, with rental-to-purchase optionality written into the contract.
Site commissioning and operator support during TBM ramp-up.
Where appropriate, Paragon Environmental Solutions collaborates with carefully selected OEMs, manufacturers, and technology partners to deliver the most effective solution for each project. This ensures clients receive proven equipment supported by independent engineering expertise and local operational support.
Share the sector, region and scope — we'll come back with references and a concrete equipment or engineering recommendation within one working day.