Client: Environmental remediation contractor (named on request under NDA)
A mid-cycle environmental contractor was mobilising to treat a legacy pit containing weathered hydrocarbon-contaminated drill cuttings and free liquids left over from a decommissioned drilling operation. Regulatory pressure required the pit to be reduced to an inert, off-site-ready product within a defined programme.
Treatment train selection exercise — dewatering, stabilisation and thermal review against a representative composite sample from across the pit.
Containerised dewatering unit specified around the peak expected sludge flow, with a properly sized polymer make-up skid rather than manual dosing.
Stabilisation mixer and chemical binder specification matched to the hydrocarbon fraction and target leachate criteria.
Ongoing engineering support during the treatment campaign, with sampling and analytical protocols agreed with the regulator up front.
Where appropriate, Paragon Environmental Solutions collaborates with carefully selected OEMs, manufacturers, and technology partners to deliver the most effective solution for each project. This ensures clients receive proven equipment supported by independent engineering expertise and local operational support.
Share the sector, region and scope — we'll come back with references and a concrete equipment or engineering recommendation within one working day.